About
City
Transportation, Department of
A permit from the Department of Transportation (DOT) is required for any vehicle or motorized equipment to cross a sidewalk in a location without an approved driveway (or dropped curb cut) in order to deliver or remove any construction material or equipment. A maximum of two sidewalk crossings will be allowed for each three hundred linear feet.
Additional resources
NYC Department of Transportation (DOT)
Address
Bureau of Permit Management and Construction Control
55 Water Street, Concourse level
New York NY 10041
Bureau of Permit Management and Construction Control
55 Water Street, Concourse level
New York NY 10041
Website
http://NYC.gov/DOT
For further assistance, please call 311 and ask for: DOT